Skip to content

Unlock Jointing-sand quantity

How much sand in the joints?

The jointing material fills the grid between the pavers: joint share = 1 − paver face/((L+joint)·(W+joint)). Volume = area · joint depth · joint share, and can be converted to tonnes. The geometry is exact; the consumption is an estimate due to compaction and waste (DS 1136: joint 2–5 mm).

See all calculators in the trade — free and without an account.

Jointing-sand quantity is locked

Create a free user account to unlock all articles, calculators, templates and range — and get access to quizzes and classes. It takes less than a minute: name, email and a password. No payment card.

You will come back here afterwards

Want to try something first? See what you can use without an account — the junior zone, the encyclopedia, the videos and more.