Studiemateriale
§Study page: train preparation in outline
Use this page to repeat the core of the setup work. It connects with the articles and checklists.
Core tasks
- 01Connection: mechanically connect cars and connect brake hoses
- 02Brake check: test brakes on entire train
- 03Shunting: move and couple wagons safely
- 04All-clear signal: only when everything is in order
Safety
- 01Never count on a wagon standing still by itself
- 02Always keep a free path away
- 03Keep distance from live parts
- 04Never skip a check
Passenger and freight trains
With goods, loading unloading and cargo securing often are included. The core is the same: safe coupling secure brakes and thorough inspection.