Skip to content

Work process: preparation before departure

From train composition to ready notification

Use the work procedure as a backbone. Adapt it to the specific train but do not skip the checks.

§Composition

  • 01Wagons sorted and arranged in the right order
  • 02Wagons coupled together mechanically
  • 03Brake hoses connected

§Inspection

  • 01Brake check performed on entire train
  • 02Load secured if it's a freight train
  • 03Visible defects and wear noted or reported

§All-clear signal

  • 01Last visual inspection of the train
  • 02Clear only when everything is in order
  • 03Take responsibility for the checks being performed