Work process: preparation before departure
From train composition to ready notification
Use the work procedure as a backbone. Adapt it to the specific train but do not skip the checks.
§Composition
- 01Wagons sorted and arranged in the right order
- 02Wagons coupled together mechanically
- 03Brake hoses connected
§Inspection
- 01Brake check performed on entire train
- 02Load secured if it's a freight train
- 03Visible defects and wear noted or reported
§All-clear signal
- 01Last visual inspection of the train
- 02Clear only when everything is in order
- 03Take responsibility for the checks being performed