The technical designer's role in product documentation under EU regulations
The CE mark on a machine is not a quality seal from an authority — it is the manufacturer's own declaration that the product meets all relevant EU safety and health requirements. Behind the small mark lies a whole documentation package and this is where the technical designer comes in: According to the education's competency goals you should be able to prepare technical documentation for CE marking including bills of materials, assembly guides, manuals, instructions for use and safety instructions.
For many years, Machinery Directive 2006/42/EF has set the framework for machinery safety in the EU. It is now being replaced by Machinery Regulation (EU) 2023/1230, which was published in 2023 and should be fully applied from 20 January 2027. A regulation applies directly in all EU countries without national legislation in between, and the new regulation explicitly takes account of newer topics such as cybersecurity, software updates and artificial intelligence in machinery. Until the transition date, manufacturers can continue to follow the directive — after that, the regulation is mandatory.
The part list binds the assembly drawing together with procurement, production and service. Each position on the drawing must be able to be found again in the list with the same number, and the list must be revised together with the drawing — a part list that lags one revision behind is a classic source of incorrect orders. In CAD/PLM systems, the parts list is often generated directly from the 3D model, which makes model quality and correctly filled-in metadata (material, standard designation, supplier number) a prerequisite for a correct list.
The instructions are legally part of the machine. It must cover the entire life cycle — transport, assembly, operation, cleaning, maintenance and disposal — and describe the residual risks that the design could not eliminate. As a technical designer you often provide the illustrations, exploded drawings and pictograms that make the instructions unambiguous. A good illustration can replace many lines of text and works across language versions.
| Document | Typical source | Fall length |
|---|---|---|
| Part list | Generated from the structure of the 3D model | Metadata is missing or outdated |
| Assembly instructions | Exploded drawings from CAD. | The sequence cannot be carried out in practice |
| Instructions for use | Technical editor + designer's figures | Remaining risks are not described |
| Declaration of conformity | Kvalitets-/complianceansvarlig | Refers to outdated standards |
“Documentation is not something you do when the machine is finished — it is part of the machine.”
— Basic principle in CE marking work
The practical advice is to build the documentation package in parallel with the construction: create the dossier structure from project start keep the parts list synced with the model and plan the illustrations for the manual while the geometry is still easy to export. That way CE marking becomes a controlled conclusion — not a panic project in the last week.