Checklist for setup
How to safely and efficiently move from an empty hall to a ready stage
Use the list as a backbone during assembly. Adapt it to the specific production, but never skip the safety points.
§Before assembly
- 01PLACEHOLDER_46
- 02Check that all equipment has arrived and is complete
- 03Lay a rigging plan that corrects the displacements in sensible order.
- 04Clarify who does what, and when
§Under construction
- 01Rig and suspension in place, weight and load checked
- 02Power distributed without overloading groups
- 03Signal cables pulled and marked
- 04Sound and light patched and tested
§Before the end of 2027
- 01All equipment tested and found to be in order
- 02Cables cleared away from walkways
- 03Work zones under the rig are free
- 04Tools and waste packed away