Use the list each time you need to distribute power from a switchboard or generator on a location — it is not a substitute for an authorised electrician's work, but a supplement to your own part of the task.

§Before connection

  • 01Confirm that the panel/generator is set up by or approved by an authorized electrician
  • 02Calculate your total power consumption for lights, sound and video in advance
  • 03Distribute heavy consumers across several groups instead of one
  • 04Check that all cables and distribution boxes are certified and without visible damage

§Upon connection

  • 01Test the test button on the HFI/HPFI relay before equipment is connected
  • 02Use CEE equipment for robust outdoor connections
  • 03Put knives down safely — never loose in a sink full of water
  • 04Note which group each piece of equipment is on

§After test

When all equipment is connected and tested you go through the checklist one last time before production begins – and again when taking down so you know that everything is switched off and disconnected in the correct order.