Control form: Visual and NDT inspection of weld seams
Structured recording of control results on a construction weld
§Part and weld identification
- 01Part/order number and drawing number
- 02Seam number or location on the drawing
- 03Welding method and welder (or robot cell) that performed the seam
- 04Date of execution and date of inspection
§Visual control
| Control point | Approved / not approved | Note |
|---|---|---|
| Nail form and size | ||
| Pores and surface defects | ||
| Slag and splatter | ||
| Deformation of the workpiece |
§NDT inspection (if required)
- 01Specify the method used: penetrant, ultrasound, X-ray, or other
- 02Specify scope: sample or 100% inspection of the seam
- 03Record findings and location if a defect is found
- 04Specify the result: approved, approved with remarks, or rejected
§Conclusion
- 01Signature from the one who performed the inspection.
- 02Possible referral for repair if the seam is rejected
- 03Archiving of the form along with other project documentation