Skip to content

Checklist: CE documentation for windows and doors

Control points before a window or door leaves the workshop

Use this checklist as a final check of the documentation when a window or external door has been finished production and is ready for delivery.

§CE marking (DS/EN 14351-1)

  • 01Is the product the right one and mixed according to instructions?
  • 02Has the factory's quality control system (self-monitoring) been followed for this production?
  • 03Is the performance declaration (DoP) filled in with the declared properties (energy, air tightness, water tightness)?
  • 04Is the CE mark visibly applied to the finished product?

§Energy requirements (BR18)

Control pointWhat you check
Building typeWhether the task is new construction, extension, summer cottage or protected building — requirements may vary
Energiklasse/ErefWhether the window meets the agreed energy class for the task
U-valueWhether the declared U-value matches the one used in the heat loss calculation
Glass typeWhether the installed glass matches the type that forms the basis for the declared values

§Craft-like control

  • 01Are the dimensions and squareness checked against the drawing?
  • 02Is the joint a tuck, T-, corner or lap joint?
  • 03Has the surface treatment been carried out and cured before delivery?