Checklist before lifting — safe setup and execution
A fixed sequence you can follow before the crane is started
Most crane accidents do not occur because the machine fails but because something was overlooked or rushed. A fixed checklist you go through every time is one of the simplest ways to avoid it. Use the one here as a starting point and adapt it to your workplace.
§1. Know the burden
- 01Weight and center of gravity — is it documented or estimated?
- 02Shape and size — does it catch wind?
- 03How should it be cut, and what equipment does it require?
§2. Check tap and diagram
- 01Is the lift within the crane's lifting diagram at the reach you need to use?
- 02Has the crane been inspected and do the safety functions work?
- 03Do you have a certificate for this specific crane?
§3. Substrate and setup
- 01Is the substructure load-bearing — or must the support legs be supported?
- 02Is the crane in level?
- 03Is there room for swing radius without hitting anything?
§4. Surroundings and weather
- 01Are there people, traffic, or obstacles in the danger area?
- 02Are there air ducts or other hazards nearby?
- 03How much is the wind blowing — is it within the limit for the lift?
§5. Communication
Arrange with the rigger who gives signals and which signals you use — or test the radio. When you can't see the load, it's the rigger's eyes that control your lift. If the connection is unclear, you stop.