Control form: Measurement report for fine mechanical part

Document measured values against the drawing's tolerances so the inspection can be traced and refound

Use this schedule to document that a finished part actually meets the dimensions the drawing requires. A completed measurement report is both your own assurance that the work is in order, and the proof a customer or quality manager can demand.

§Master data

FieldFilled in with.
Ordre-/emnenummer
Drawing number and revision
Material (incl. any certificate number)
Date of inspection
Performed by.
Measuring equipment used (incl. calibration date)

§The goal of being able to link connect and control equipment with analog HF digital and microcomputer technology

Mål nr.Nominal dimension: the 'ideal' dimension you start with.ToleranceMeasured valueOK / scrapped
1
2
3
4
5

§Surface and appearance

  • 01Surface roughness checked against drawing specification (Ra value)
  • 02Surface treatment performed and checked (e.g. anodizing tinplating passivation)
  • 03No visible scratches, burrs or damage
  • 04Thread checked with go/no-go gauge

§Approval

FieldFilled in with.
Total result (approved/rejected/rejected with remark)
Signature inspector.
Date

Save the completed report with the order or in the company's quality system. On critical parts — e.g. medical or safety components — a traceable measurement report is often a requirement in itself, regardless of whether the part passed inspection.