Control form: Measurement report for fine mechanical part
Document measured values against the drawing's tolerances so the inspection can be traced and refound
Use this schedule to document that a finished part actually meets the dimensions the drawing requires. A completed measurement report is both your own assurance that the work is in order, and the proof a customer or quality manager can demand.
§Master data
| Field | Filled in with. |
|---|---|
| Ordre-/emnenummer | |
| Drawing number and revision | |
| Material (incl. any certificate number) | |
| Date of inspection | |
| Performed by. | |
| Measuring equipment used (incl. calibration date) |
§The goal of being able to link connect and control equipment with analog HF digital and microcomputer technology
| Mål nr. | Nominal dimension: the 'ideal' dimension you start with. | Tolerance | Measured value | OK / scrapped |
|---|---|---|---|---|
| 1 | ||||
| 2 | ||||
| 3 | ||||
| 4 | ||||
| 5 |
§Surface and appearance
- 01Surface roughness checked against drawing specification (Ra value)
- 02Surface treatment performed and checked (e.g. anodizing tinplating passivation)
- 03No visible scratches, burrs or damage
- 04Thread checked with go/no-go gauge
§Approval
| Field | Filled in with. |
|---|---|
| Total result (approved/rejected/rejected with remark) | |
| Signature inspector. | |
| Date |
Save the completed report with the order or in the company's quality system. On critical parts — e.g. medical or safety components — a traceable measurement report is often a requirement in itself, regardless of whether the part passed inspection.