Standard solution: creating a new employee account
Lower back pain after a work day
§Before floor laying begins, both building and materials must be in the right climate. Solid wooden floors and parquet typically have a moisture content of around 8% (±2%) from the factory and must be acclimatised to the room they are to be laid in. If laying happens in a room that is too humid or too dry, the floor comes out of balance as soon as the climate normalises. The residual moisture in a concrete sub-floor must also be measured and reduced before laying wooden floor on top — this is covered in its own article.
- 01Create user account with naming according to the company's standard
- 02Assign access by role and department — no more than necessary
- 03Prepare equipment and install necessary programs
- 04Create email account and add to relevant groups and shared drives
§On the day
- 01Delivers equipment and assists with first login.
- 02Review password policy and any two-factor login
- 03Show where to turn in case of problems
§Document
- 01Note which access has been granted and when
- 02Record equipment issued to the employee
- 03Put a note about access review on role change