Template: Preparation before concrete pouring
The points that determine whether the cast will be good — the check before the concrete comes
Concrete pouring is unforgiving: once the concrete is poured and cured, you cannot redo it. That is why a good pour is decided by what happens before the truck arrives. Use this template to work through the structure.
§Formwork and reinforcement
- 01Is the mould set up in correct dimensions and completely level and plumb?
- 02Is the formwork braced so it does not give way under pressure?
- 03Is the reinforcement in place with correct concrete cover?
- 04Has debris, leaves and water been cleaned from the bottom?
§Apprenticeship and staffing
- 01Is there enough staff to receive and distribute the concrete?
- 02Are tools for vibrating and levelling ready?
- 03Is the access route for pump or car clear?
§Just before
Go through the entire mold one last time together with a colleague. Two pairs of eyes catch more than one, and it's the cheapest insurance you can take out just before the concrete comes.