Process: safe asbestos work in small amounts
The sequence from mapping to disposal
§Step sequence
- 01Clarify whether the material contains asbestos — in case of doubt, treat it as asbestos-containing
- 02Make sure that training requirements and any notification are met before work starts
- 03Delineate the work area and keep unauthorized people away
- 04Put on respiratory protection with appropriate filter, disposable suit, and gloves
- 05Keep the material moist to bind the dust and avoid dusty methods
- 06Remove the material as whole as possible rather than breaking or grinding it
- 07Vacuum with suitable filter instead of sweeping or brushing
- 08Package the waste tightly, label it, and dispose of it as hazardous waste
- 09Remove the suit in a controlled manner so fibres are not carried out