Skip to content

Process: safe asbestos work in small amounts

The sequence from mapping to disposal

§Step sequence

  • 01Clarify whether the material contains asbestos — in case of doubt, treat it as asbestos-containing
  • 02Make sure that training requirements and any notification are met before work starts
  • 03Delineate the work area and keep unauthorized people away
  • 04Put on respiratory protection with appropriate filter, disposable suit, and gloves
  • 05Keep the material moist to bind the dust and avoid dusty methods
  • 06Remove the material as whole as possible rather than breaking or grinding it
  • 07Vacuum with suitable filter instead of sweeping or brushing
  • 08Package the waste tightly, label it, and dispose of it as hazardous waste
  • 09Remove the suit in a controlled manner so fibres are not carried out