Checklist: before lifting
The points that are reviewed before a crane lift begins
§The load
- 01The weight is known and is within the crane's capacity in the current setup
- 02The centre of gravity is assessed and lifting points are placed accordingly
- 03The load is loose from the surface — nothing is fixed
§The equipment
- 01Rigging equipment is inspected and undamaged
- 02The equipment's work load matches the load and suspension angle
- 03Edge protection is placed where the strap lies over sharp edges
§Crane and positioning
- 01Daily inspection has been carried out and operation brakes and emergency stop work
- 02Mobile cranes: the ground bears, outriggers are out and braced, the crane is level
- 03The load diagram for the current setup is read
§Area and communication
- 01No persons under or in the load's movement path
- 02Swing and running track are clear, and the hazard zone is cordoned off as needed
- 03Signals between slingers and crane operators are agreed, and only one directs