Process: controlled lifting from start to finish
The sequence in a safe lift
§Step sequence
- 01Attach the load and check that the slings are positioned correctly and symmetrically around the center of gravity
- 02Tighten gradually until it just holds, and hold back
- 03Test lift a few centimeters and see that the load hangs level and steady — straighten if it tilts
- 04Hoist softly up without jerking, and lead the load in smooth movements
- 05Keep the load as low as possible during transport and control swing with a possible guide line
- 06Lower carefully towards a sustainable and tidy disposal location
- 07Release the tension on the equipment, check that the load is stable, and then remove the straps