Skip to content

Checklist: fossil-free construction site

Get a good start in restructuring the machine park and operations on site

§Map the machinery fleet

  • 01What machines under approximately 2.5 tonnes can be replaced with electric-powered models?
  • 02What heavy machines do not yet exist as electric-powered alternatives?
  • 03Can biodiesel be used for machines that cannot yet be electrified?

§Plan the cuts according to desired cuts

  • 01Is there sufficient electrical capacity on site to charge multiple machines at once?
  • 02Where are charging stations or mobile battery packs most appropriately placed?
  • 03Is there a plan for charging during breaks and outside working hours?

§Hand tools and minor equipment

  • 01Can petrol- or pneumatic-powered hand tools be replaced with battery-powered?
  • 02Are heat sources on site electrical or biofuel rather than oil burners?

§Documentation

  • 01Record fuel and consumption for each machine on site
  • 02Note what proportion of machine hours are electric-powered
  • 03Save documentation if the project is subject to fossil-free operations requirements