Skip to content
← Articles/§ 17·Operation & maintenance

Material control and rejection

How to assess whether scaffolding components can be used or must be removed

2026-06-16·6 min reading

Each individual scaffolding component carries its part of the overall construction. A cracked column, a deformed beam or a half-eaten scaffold board can cost lives. Here are the criteria for discarding components — and the culture for doing it consistently.

The rest of the article is locked

Opret en gratis bruger for at låse op for alle artikler, beregnere, skabeloner og sortiment — og få adgang til quizzer og klasser. Det tager under et minut: navn, email og en adgangskode. Intet betalingskort.

Vil du vide mere? Læs mere om Discebo — free and without an account.