Skip to content
← Articles/§ 14·Installations

District heating and the insulator

Which insulation class must the district heating pipe, the heat exchanger and the domestic hot water have?

2026-10-06·6 min reading

More than half of residential buildings get their heat from a district heating network. Here are the insulation classes from table 6.4 of DS 452 for district heating in and between buildings, for domestic hot water, heat exchangers and tanks — and why the requirement is stricter outdoors than indoors.

Every other dwelling is on a network

The chart shows how residential buildings are heated. Notice how large the share of district heating is: more than half. Each of those houses has pipes, a heat exchanger or a unit and distribution pipes that must be insulated. That is the insulator's work.

How residential buildings are heated
not looked up The register did not respond, or it does not cover this property yet. That does not mean there is no value.

Which class must the district heating pipe have?

The Building Regulations say: «The installations must be insulated against heat loss and condensation in accordance with DS 452 Thermal insulation of technical installations» (BR18 § 390). The class is in table 6.4 of DS 452. The free version of the table is in the corrigendum from 2018:

InstallationOutdoors, in the ground or unheated (≤ 5 °C)Heated room (> 5 °C)
District heating inside the building and distribution pipes between buildingsCl. 6Cl. 4
Distribution pipes with heating only in the heating season and at most 45 °CCl. 6Cl. 3
Connecting pipes in the same room as the heat emitter—Cl. 0
Connecting pipes in other rooms and connecting pipes in floors, walls or ceilingsCl. 6Cl. 2
Domestic hot water: distribution and circulation pipesCl. 6Cl. 4
Heat exchangers and hot water tanks as well as water heatersCl. 6Cl. 5

«≤ 5 °C» covers installations outdoors, in the ground, in an unheated room outside the building envelope and in rooms heated to at most 5 °C. «> 5 °C» is a heated room or an unheated room inside the building envelope. The table covers installations in and between buildings.

The rest of the article is locked

Create a free user account to unlock all articles, calculators, templates and range — and get access to quizzes and classes. It takes less than a minute: name, email and a password. No payment card.

Want to try something first? See what you can use without an account — the junior zone, the encyclopedia, the videos and more.