Skip to content
← Articles/§ 09·Checklist

Checklist: handover of paving

Fall, evenness, joints and edges — before you hand over

2026-06-14·4 min reading

A checklist for handing over a finished paving: fall, evenness, joint filling and edges — so the work lasts and is handed over without defects. The figures follow NfA 1992 and DS 1136.

The rest of the article is locked

Opret en gratis bruger for at låse op for alle artikler, beregnere, skabeloner og sortiment — og få adgang til quizzer og klasser. Det tager under et minut: navn, email og en adgangskode. Intet betalingskort.

Vil du vide mere? Læs mere om Discebo — free and without an account.