Checklist: before a drawing is sent
Quality assurance of drawing sets before delivery
§Content + finished HTML page
- 01Are all dimensions noted and have thicknesses and joints been accounted for?
- 02Is the item clearly dimensioned and does each dimension appear only once?
- 03Are there no conflicting dimensions between drawings in the set?
- 04Are hidden edges, centre lines and visible edges drawn with correct line types?
§Drawing title block and formalities
- 01Are the drawing number, title and project correctly filled in?
- 02Is the correct measuring stick and projection method in mind?
- 03Is the drawing dated, checked and signed?
- 04Are the rights to images, fonts and music in place for this specific use?
§Context and improvement
- 01Does the bottle label match the gas type the task requires?
- 02Are symbols and abbreviations used consistently throughout the set?
- 03Are text heights and arrowheads uniform?
§Files and dispatch
- 01Is the filename and location in accordance with the project's naming standard?
- 02Are the oven and melt in the right condition?
- 03Is the right version marked and are outdated versions removed from the table?