Skip to content

Checklist: Condition report at move-in and move-out

Systematic inspection of the building so the survey holds if later challenged

Use this checklist each time you perform a move-in or move-out inspection. Go systematically room by room, and note everything on the spot — not afterwards from memory.

§Master data

  • 01Address and lease number
  • 02Type of inspection: move-in / move-out
  • 03Date and time
  • 04Present: tenant / lessor's representative / others
  • 05Deadline for landlord's demand for repairs (typically no later than 2 weeks after move-out is confirmed)

§Room-by-room review

RumFloorWalls/ceilingInventar/hvidevarerNotePhoto no.
Entrance
Living room
Kitchen
Room(s)
Bad/toilet
Possible basement/attic

§Scale and projection method

Measuring toolRead valuePhoto no.
El
Water
Heating

§Assessment of damage

  • 01Damage assessed as normal wear (should not be repaired by tenant)
  • 02Damage assessed as possible breach (requires further assessment/documentation)
  • 03Justification for each assessment noted briefly

§Conclusion

  • 01Copy of report delivered to tenant
  • 02Photo archived with the report
  • 03Any requests for repairs submitted within the deadline