Form: Water sample and chlorine analysis in swimming pool
Fixed checklist for manual water test before opening and ongoing measurement equipment reading.
Use this schedule for daily water testing in the swimming pool. It covers the manual inspection before opening and the ongoing readings required by the regulation on swimming pool facilities.
§Before opening — manual control
- 01Date and time of inspection
- 02Free chlorine measured manually (mg/l) — compared with automatic measuring equipment
- 03pH measured manually — compared with automatic measuring equipment
- 04Temperature in the pool
- 05Does the automatic measuring equipment correspond to the manual measurement? Yes/No
- 06Signature.
| Time point | Free chlorine (mg/l) | pH | Temperature | Deviation? | Initials |
|---|---|---|---|---|---|
| Before opening | |||||
| +6 hours | |||||
| +12 hours |
§In case of deviation
- 01Note the deviation and the time
- 02Assess whether the basin should be temporarily closed
- 03Check automatic dosing equipment for errors
- 04Repeat measurement after adjustment
- 05Inform the responsible manager if the deviation cannot be corrected immediately
§Weekly meeting.
| Uge | Number of deviations | Cause | Action |
|---|---|---|---|
§Chemicals and safety
- 01Are safety data sheets for chlorine and pH products available and up to date?
- 02Are protective equipment (gloves, eye protection) available in the technical room?
- 03Are chemicals stored separately and securely locked?