Skip to content

Checklist: preparation for DGNB certification project

The most important preparations before a project begins with certification

§Ambition and organization

  • 01Has the ambition level (silver, gold or platinum) been chosen and anchored with the building owner?
  • 02Has a project manager been appointed for the certification process?
  • 03Do the project's advisors and contractors know the documentation requirements?

§Documentation of climate and materials

  • 01Has an LCA been prepared for the project?
  • 02Have EPDs been obtained for the main materials – preferably product-specific?
  • 03Is the material choice documented regarding recyclability and hazardous substances?

§Social and operational conditions

  • 01Has the indoor climate, daylight and noise conditions been assessed and documented?
  • 02Is there a plan for the building's operation and maintenance after handover?
  • 03Is the waste room tidy and are containers closed properly?

§Timeline and control

  • 01Is time set aside for the independent review that certification requires?
  • 02Has documentation been collected continuously so it doesn't need to be recreated at the end?